Final Recommendations
Tier 1 Recommendations
Project Title Facility Location Description Cost Estimate (2017 $) Project Type
Bender Road Bridge Replacement
View Project Sheet
Bender Road Big Bone Creek Replace the Bender Road bridge over Big Bone Creek. $2,050,000 Bridge Replacement/Repair
Bicycle Encouragement and Safety Program
View Project Sheet
Various Facilities Various Locations Encourage the use of bicycles and improve awareness/safety throughout Boone County by: (1) Conducting a comprehensive review of state, county and city routes to identify needed locations for "Share the Road" signs. Install signs as recommended. (2) Create a map/brochure and/or application to inform the public of existing and planned bicycle and multi-use paths. $50,000 Bike/Ped
Bicycle Sharing Program
View Project Sheet
Various Facilities Various Locations Investigate opportunities to partner with Red Bike and private companies to develop a public/private operating and capital funding plan that expands bikesharing services and facilities to suburban Boone County to support workforce development/accessibility and overall recreational health and well-being. $250,000 Bike/Ped
Boone County Comprehensive Plan Update: Roadway Network Connectivity Language
View Project Sheet Various Facilities Future development of all types Continue to advance a street connection network throughout the County in the update of the Comprehensive Plan. Encourage private developers to construct local roadway networks that provide and enhance connectivity to State, County and City roads. This offers the public multiple travel options, thereby distributing traffic amongst several travel nodes to minimize congestion and improve safety. Policy
Boone County Freight Roundtable to Address Truck Parking
View Project Sheet N/A Boone County Partner with Northern Kentucky Tri-ED, Tri-State Logistics Council and the Cincinnati/Northern Kentucky International Airport to convene a Freight Roundtable with public officials and private freight businesses to identify opportunities to address truck parking challenges. Policy
Boone County Traffic Control Center and Corridor Pilot Project
View Project Sheet TBD Various Routes Improve congestion and mobility on major corridors by developing a business plan to identify a location for a Boone County traffic control center to maintain and operate specified signals and signal systems. Include in the control center's planning, future use by all three Northern Kentucky counties (Boone, Kenton, Campbell). Construct the traffic control center as recommended. Partner with KYTC to transfer maintenance, timing responsibilities and associated funding of specified signals to Boone County. As technology advances, consider application of new innovations such as adaptive signals and vehicle to infrastructure communication along these corridors. $2,710,000 Traffic Operations
Boone County Zoning and Subdivision Regulation Update: Street Lighting Policy
View Project Sheet Various Facilities Future Industrial and Commercial Development Establish a policy to include street lighting on private and/or public roadways in new industrial parks or other development areas that generate night-time pedestrian and/or bicycle traffic. Consider requiring solar-powered and/or LED lighting to reduce the operational costs. Policy
Boone County Zoning and Subdivision Regulation Update: Truck Parking Policy
View Project Sheet N/A Future Industrial and Commercial Development Establish a policy to include infrastructure for truck parking, staging and queueing to more efficiently and safely handle such operations on private property and minimize impacts upon public right-of-way. Policy
Camp Ernst Road Widening Phase 1
View Project Sheet
Camp Ernst Road Boone County Arboretum to KY 237 (Pleasant Valley Road) Widen Camp Ernst Road from two to four lanes and extend the multi-use path from the KY 237 (Camp Ernst/Pleasant Valley) widening project to improve safety and mobility. $27,910,000 Roadway Widening/Relocation/New Facility
Conner Road Multi-Use Path
View Project Sheet
Conner Road KY 237 (North Bend Road) to KY 20 (Petersburg Road) Construct approximately 1.3 miles of multi-use path along Conner Road as part of the CVG Loop Trail to connect Conner High School with surrounding residential and commercial development. Include curb and gutter where needed. $2,050,000 Bike/Ped
Dixie Highway Enhanced Transit Corridor
View Project Sheet
US 25 (Dixie Highway) TANK Transit Center on Mall Road to the TANK Transit Center in Covington Create a high-frequency, enhanced bus transit corridor. Provide specialized branding and operational treatments. Improve bus stop/station design and amenities. Include bicycle and pedestrian facilities for multi-modal safety, mobility and connectivity. $5,360,000 Transit
First/Last Mile Innovative Technology Pilot Projects
View Project Sheet
Various Facilities Boone County Collaborate with regional partners to establish innovative public/private pilot projects using Connected and Automated Vehicles (CAV), ridesharing, carsharing, alternative fuels, Smart device Apps, or other transportation technology advancements to provide vital “first/last mile” connections. This includes Boone County working with the Kentucky Legislature to establish an approach permitting the safe testing and public use of automated vehicles on public roadways. Transit
Graves Road Interchange
View Project Sheet
I-275 Graves Road Improve mobility and reduce congestion in the Hebron area by constructing a new interchange on I-275 at Graves Road. Widen Graves Road from two to four travel lanes with multi-use path as recommended in the Interchange Justification Study. $42,410,000 Roadway Widening/Relocation/New Facility
Hicks Pike Reconstruction Phase 1
View Project Sheet
Hicks Pike Man O War Boulevard to KY 338 (Richwood Road) Reconstruct Hicks Pike and provide a multi-use path. $8,820,000 Roadway Maintenance/Reconstruction
I-71 and I-75 Expanded Truck Parking
View Project Sheet
I-71 and I-75 rest areas on SB/NB I-71/75, weigh station on SB I-71 in Boone County, and weigh station on SB I-75 in Grant County Install additional truck parking and Intelligent Transportation System (ITS) signage to identify the number of available parking spaces at rest areas and weigh stations on I-71 and I-75. $1,760,000 Freight
I-71/75 Active Traffic Demand Management Study
View Project Sheet
I-71/75 I-71/75 Interchange with KY 536 (Mount Zion Road) to Brent Spence Bridge Conduct an Active Traffic Demand Management (ATDM) study to improve capacity and travel time for all users within the existing I-71/75 right-of-way during peak AM and PM travel times. Consider innovative measures such as bus on shoulder, high-occupancy vehicle lanes, truck only lanes, variable speed limits, ramp metering, etc. $300,000 Study
I-71/75 Auxiliary Lanes
View Project Sheet
I-71/75 KY 536 (Mount Zion Road) to US 42 Add north- and southbound auxiliary lanes on I-71/75 from KY 536 (Mount Zion Road) to US 42. (Kentucky Transportation Cabinet Item Number 06-14.5). $25,360,000 Roadway Widening/Relocation/New Facility
Kentaboo Avenue Sidewalk
View Project Sheet
Kentaboo Avenue Curtis Avenue to Virginia Avenue Construct 3,720 feet of sidewalk along the south side of the roadway to connect homes and churches to Florence Park. $1,070,000 Bike/Ped
KY 1017 (Turfway Road) to I-275 Interchange
View Project Sheet
Modifications I-71/75 KY 1017 (Turfway Road) to I-275 Complete an Interchange Modification Study to determine improvements to upgrade the I-71/75 interchanges with I-275, KY 236 (Donaldson Highway), and KY 1017 (Turfway Road) to improve safety and capacity and mobility to northern Boone and Kenton Counties. Construct improvements as recommended. $90,000,000 Roadway Widening/Relocation/New Facility
KY 14 (Mary Grubbs Highway) Interchange Modification Phase 1
View Project Sheet
I-75 KY 14 (Mary Grubbs Highway) Southbound Ramps Conduct an Interchange Modification Study to identify a short-term safety and congestion improvement for the southbound exit ramp and intersection with KY 14. Dedicated dual left turn lanes and a dedicated right turn lane should be considered to improve congestion. Construct the improvements as recommended. $2,130,000 Roadway Maintenance/Reconstruction
KY 20 (Petersburg Road) Widening
View Project Sheet
KY 20 (Petersburg Road) Graves Road to KY 237 (North Bend Road) Widen KY 20 (Petersburg Road) from two to four lanes with multi-use path to improve mobility and reduce congestion in northern Boone County. $23,800,000 Roadway Widening/Relocation/New Facility
KY 20/Aviation Boulevard Intersection Improvement
View Project Sheet
KY 20 (Petersburg Road) Aviation Boulevard Install a left turn lane on eastbound and westbound KY 20 (Petersburg Road) at Aviation Boulevard. Consider installation of a new traffic signal. $820,000 Traffic Operations
KY 236 (Donaldson Highway) Widening
View Project Sheet
KY 236 (Donaldson Highway) KY 3076 (Mineola Pike) to KY 842 (Houston Road) Widen KY 236 (Donaldson Highway) from two to four lanes to improve capacity and support economic development. Include a multi-use path as part of the CVG Loop Trail. $20,520,000 Roadway Widening/Relocation/New Facility
KY 237 (Gunpowder Road) Widening
View Project Sheet
KY 237 (Gunpowder Road) KY 536 (Mount Zion Road) to US 42 Widen KY 237 (Gunpowder Road) from two to four lanes with multi-use path to improve safety and mobility through central Boone County. $11,080,000 Roadway Widening/Relocation/New Facility
KY 237 (North Bend Road) Widening
View Project Sheet
KY 237 (North Bend Road) KY 2846 (Tanner Road)/Global Way to Graves Road Widen KY 237 (North Bend Road) from two to four lanes and widen the two roundabouts at Graves Road and Cardinal Way from one to two lanes to reduce congestion. $12,900,000 Roadway Widening/Relocation/New Facility
KY 237/Conrad Lane Intersection Improvements
View Project Sheet
KY 237 (North Bend Road) Conrad Lane Install full right turn lanes on the KY 237 (North Bend Road) northbound and southbound approaches to Conrad Lane to improve capacity and safety. $700,000 Traffic Operations
KY 3076 (Mineola Pike) Extension Phase 1
View Project Sheet
New Facility South Airfield Drive to KY 236 (Donaldson Highway) Extend KY 3076 (Mineola Pike) approximately 0.5 miles to provide a new, four lane direct connection from the Cincinnati/Northern Kentucky International Airport to I-275. Construct a multi-use path as part of the CVG Loop Trail. $4,880,000 Roadway Widening/Relocation/New Facility
KY 3076 (Mineola Pike) Extension Phase 2
View Project Sheet
New Facility South Airfield Drive to KY 1017 (Aero Parkway) Extend KY 3076 (Mineola Pike) south approximately 1.15 miles to KY 1017 (Aero Parkway) along a new four lane facility. Reconstruct a portion of KY 717 (Turfway Road) to intersect with the new roadway. Construct a multi-use path as part of the CVG Loop Trail. $9,440,000 Roadway Widening/Relocation/New Facility
KY 3076 (Mineola Pike) Interchange Modification
View Project Sheet
I-275 KY 3076 (Mineola Pike) Perform an Interchange Modification Study to reconstruct the interchange at KY 3076 (Mineola Pike) to improve mobility and support economic development. Include a dedicated bicycle and pedestrian facility across the interchange. Construct the improvements as recommended. $44,000,000 Roadway Widening/Relocation/New Facility
KY 3076 (Mineola Pike) Widening
View Project Sheet
KY 3076 (Mineola Pike) KY 236 (Donaldson Highway) to the I-275 Eastbound Ramps Widen KY 3076 (Mineola Pike) from two to four travel lanes to support freight and improve mobility between the Cincinnati/Northern Kentucky International Airport and I-275 and construct a multi-use path. $16,000,000 Roadway Widening/Relocation/New Facility
KY 338 (Richwood Road) Interchange Modification
View Project Sheet
I-71/75 KY 338 (Richwood Road) Reconstruct the I-71/75 interchange at KY 338 (Richwood Road) and widen KY 338 from two to four lanes. This project also includes the widening of US 25 (Dixie Highway) from two to four lanes between KY 338 to Winning Colors Drive with grade separation of KY 338 at US 25 and railroad overpass for KY 338. (Kentucky Transportation Cabinet Item Number 06-18.00 and 06-351.10). $96,950,000 Roadway Widening/Relocation/New Facility
KY 338 (Richwood Road) Widening
View Project Sheet
KY 338 (Richwood Road) Hicks Pike to Triple Crown Boulevard Widen KY 338 (Richwood Road) from two to four lanes with multi-use paths on both sides of the roadway. $5,330,000 Roadway Widening/Relocation/New Facility
KY 536 (Mount Zion Road) Interchange Modification
View Project Sheet
I-71/75 KY 536 (Mount Zion Road) Reconstruct the I-71/75 interchange at KY 536 (Mount Zion Road). (Kentucky Transportation Cabinet Item Number 06-14.00). $27,510,000 Roadway Widening/Relocation/New Facility
KY 842 Richardson Road Bridge Replacement
View Project Sheet
KY 842 (Richardson Road) Norfolk Southern Railroad Replace bridge over Norfolk Southern Rail Road on KY 842 (Richardson Road). (Kentucky Transportation Cabinet Item Number 06-1087.00). $6,000,000 Bridge Replacement/Repair
Litton Lane/KY 237 Intersection Improvement
View Project Sheet
Litton Lane KY 237 (North Bend Road) Install video actuation to detect the end of the queue on the eastbound Litton Lane approach to the intersection with KY 237 (North Bend Road) to increase capacity. Adjust signal timing as needed. $20,000 Traffic Operations
Longbranch Road Bridge Replacement
View Project Sheet
Longbranch Road Fowlers Creek Replace the Longbranch Road bridge over Fowlers Creek. $2,050,000 Bridge Replacement/Repair
Mall Road Connector Phase 1
View Project Sheet
New Facility Mall Road to KY 842 (Hopeful Church Road) Perform a study to determine the preferred alignment of a new, 1.4 mile, two lane roadway with multi-use path between Mall Road to KY 237 (Pleasant Valley Road) to provide an alternative route to congested arterials in the western Florence and Oakbrook areas. Implement the first phase identified in this study from Mall Road to KY 842. $9,440,000 Roadway Widening/Relocation/New Facility
Old Union Road Sidewalk (Boone County)
View Project Sheet
Old Union Road Old Union Road to US 42 Install approximately 250 feet of pedestrian facilities on Old Union Road to connect the multi-use path along Orleans Boulevard to the sidewalk on Old Union Road, near the intersection with US 42. $200,000 Bike/Ped
Pedestrian Facility Program
View Project Sheet
Various Facilities Boone County Continue Boone County's pedestrian facility program to install sidewalks , multi-use paths, crosswalks, lighting, and other public infrastructure to facilitate safe walking and bicycling as needed throughout the County. $300,000 Bike/Ped
TANK CVG Transit Station
View Project Sheet
TBD Cincinnati/Northern Kentucky International Airport In conjunction with the CVG Master Plan Update, construct a new transit station at the Cincinnati/Northern Kentucky International Airport to service multiple, future TANK transit route expansions connecting this vital transportation node with the region. Hub features include a sheltered waiting/transfer area and bus bay with storage capacity for up to three, 40 foot buses. $2,050,000 Transit
TANK Pilot Service Program
View Project Sheet
Various Facilities Hebron, CVG, Mt Zion/Richwood Road employment centers Provide operating funds for TANK pilot service that leverage private contributions and connect industrial parks and major employers with high volume TANK fixed route and Park & Ride lots. $250,000 Transit
Toebben Drive/KY 536 Intersection Improvement
View Project Sheet
Toebben Drive KY 536 (Mount Zion Road) Install a right turn lane on the northbound Toebben Drive approach to the intersection with KY 536 to improve capacity at the intersection and support freight. $450,000 Traffic Operations
Two System Transit Transfer Policy
View Project Sheet
N/A Ohio, Kentucky, Indiana Region Encourage TANK and Metro to consider updating existing policies to lessen financial and physical barriers associated with using both transit systems to access jobs. Policy
US 42 Adaptive Signal Control Improvements
View Project Sheet
US 42 KY 237 (Pleasant Valley Road) to Ewing Boulevard Perform a signal timing and coordination study to examine the existing signal system and potential benefit of introducing adaptive signal controls. Install improvements as recommended. $820,000 Traffic Operations
US 42 Interchange Modification
View Project Sheet
I-71/75 US 42 Complete an Interchange Modification Study and reconstruct the interchange as recommended. Include a dedicated bicycle and pedestrian facility across the interchange. $58,500,000 Roadway Widening/Relocation/New Facility
Youell Road Connector
View Project Sheet
New Facility KY 1017 (Aero Parkway) to KY 237 (North Bend Road) Construct a new, four lane roadway to connect KY 1017 (Aero Parkway) and KY 237 (North Bend Road) in the area southwest of the Cincinnati/Northern Kentucky International Airport to assist in accommodating future, planned industrial development on KY 1017. Include a multi-use path as part of the CVG Loop Trail. $27,600,000 Roadway Widening/Relocation/New Facility
Project Title | Facility | Location | Description | Cost Estimate (2017 $) | Project Type |
---|---|---|---|---|---|
Bender Road Bridge Replacement View Project Sheet | Bender Road | Big Bone Creek | Replace the Bender Road bridge over Big Bone Creek. | $2,050,000 | Bridge Replacement/Repair |
Bicycle Encouragement and Safety Program View Project Sheet | Various Facilities | Various Locations | Encourage the use of bicycles and improve awareness/safety throughout Boone County by: (1) Conducting a comprehensive review of state, county and city routes to identify needed locations for "Share the Road" signs. Install signs as recommended. (2) Create a map/brochure and/or application to inform the public of existing and planned bicycle and multi-use paths. | $50,000 | Bike/Ped |
Bicycle Sharing Program View Project Sheet | Various Facilities | Various Locations | Investigate opportunities to partner with Red Bike and private companies to develop a public/private operating and capital funding plan that expands bikesharing services and facilities to suburban Boone County to support workforce development/accessibility and overall recreational health and well-being. | $250,000 | Bike/Ped |
Boone County Comprehensive Plan Update: Roadway Network Connectivity Language View Project Sheet | Various Facilities | Future development of all types | Continue to advance a street connection network throughout the County in the update of the Comprehensive Plan. Encourage private developers to construct local roadway networks that provide and enhance connectivity to State, County and City roads. This offers the public multiple travel options, thereby distributing traffic amongst several travel nodes to minimize congestion and improve safety. | Policy | |
Boone County Freight Roundtable to Address Truck Parking View Project Sheet | N/A | Boone County | Partner with Northern Kentucky Tri-ED, Tri-State Logistics Council and the Cincinnati/Northern Kentucky International Airport to convene a Freight Roundtable with public officials and private freight businesses to identify opportunities to address truck parking challenges. | Policy | |
Boone County Traffic Control Center and Corridor Pilot Project View Project Sheet | TBD | Various Routes | Improve congestion and mobility on major corridors by developing a business plan to identify a location for a Boone County traffic control center to maintain and operate specified signals and signal systems. Include in the control center's planning, future use by all three Northern Kentucky counties (Boone, Kenton, Campbell). Construct the traffic control center as recommended. Partner with KYTC to transfer maintenance, timing responsibilities and associated funding of specified signals to Boone County. As technology advances, consider application of new innovations such as adaptive signals and vehicle to infrastructure communication along these corridors. | $2,710,000 | Traffic Operations |
Boone County Zoning and Subdivision Regulation Update: Street Lighting Policy View Project Sheet | Various Facilities | Future Industrial and Commercial Development | Establish a policy to include street lighting on private and/or public roadways in new industrial parks or other development areas that generate night-time pedestrian and/or bicycle traffic. Consider requiring solar-powered and/or LED lighting to reduce the operational costs. | Policy | |
Boone County Zoning and Subdivision Regulation Update: Truck Parking Policy View Project Sheet | N/A | Future Industrial and Commercial Development | Establish a policy to include infrastructure for truck parking, staging and queueing to more efficiently and safely handle such operations on private property and minimize impacts upon public right-of-way. | Policy | |
Camp Ernst Road Widening Phase 1 View Project Sheet | Camp Ernst Road | Boone County Arboretum to KY 237 (Pleasant Valley Road) | Widen Camp Ernst Road from two to four lanes and extend the multi-use path from the KY 237 (Camp Ernst/Pleasant Valley) widening project to improve safety and mobility. | $27,910,000 | Roadway Widening/Relocation/New Facility |
Conner Road Multi-Use Path View Project Sheet | Conner Road | KY 237 (North Bend Road) to KY 20 (Petersburg Road) | Construct approximately 1.3 miles of multi-use path along Conner Road as part of the CVG Loop Trail to connect Conner High School with surrounding residential and commercial development. Include curb and gutter where needed. | $2,050,000 | Bike/Ped |
Dixie Highway Enhanced Transit Corridor View Project Sheet | US 25 (Dixie Highway) | TANK Transit Center on Mall Road to the TANK Transit Center in Covington | Create a high-frequency, enhanced bus transit corridor. Provide specialized branding and operational treatments. Improve bus stop/station design and amenities. Include bicycle and pedestrian facilities for multi-modal safety, mobility and connectivity. | $5,360,000 | Transit |
First/Last Mile Innovative Technology Pilot Projects View Project Sheet | Various Facilities | Boone County | Collaborate with regional partners to establish innovative public/private pilot projects using Connected and Automated Vehicles (CAV), ridesharing, carsharing, alternative fuels, Smart device Apps, or other transportation technology advancements to provide vital “first/last mile” connections. This includes Boone County working with the Kentucky Legislature to establish an approach permitting the safe testing and public use of automated vehicles on public roadways. | Transit | |
Graves Road Interchange View Project Sheet | I-275 | Graves Road | Improve mobility and reduce congestion in the Hebron area by constructing a new interchange on I-275 at Graves Road. Widen Graves Road from two to four travel lanes with multi-use path as recommended in the Interchange Justification Study. | $42,410,000 | Roadway Widening/Relocation/New Facility |
Hicks Pike Reconstruction Phase 1 View Project Sheet | Hicks Pike | Man O War Boulevard to KY 338 (Richwood Road) | Reconstruct Hicks Pike and provide a multi-use path. | $8,820,000 | Roadway Maintenance/Reconstruction |
I-71 and I-75 Expanded Truck Parking View Project Sheet | I-71 and I-75 | rest areas on SB/NB I-71/75, weigh station on SB I-71 in Boone County, and weigh station on SB I-75 in Grant County | Install additional truck parking and Intelligent Transportation System (ITS) signage to identify the number of available parking spaces at rest areas and weigh stations on I-71 and I-75. | $1,760,000 | Freight |
I-71/75 Active Traffic Demand Management Study View Project Sheet | I-71/75 | I-71/75 Interchange with KY 536 (Mount Zion Road) to Brent Spence Bridge | Conduct an Active Traffic Demand Management (ATDM) study to improve capacity and travel time for all users within the existing I-71/75 right-of-way during peak AM and PM travel times. Consider innovative measures such as bus on shoulder, high-occupancy vehicle lanes, truck only lanes, variable speed limits, ramp metering, etc. | $300,000 | Study |
I-71/75 Auxiliary Lanes View Project Sheet | I-71/75 | KY 536 (Mount Zion Road) to US 42 | Add north- and southbound auxiliary lanes on I-71/75 from KY 536 (Mount Zion Road) to US 42. (Kentucky Transportation Cabinet Item Number 06-14.5). | $25,360,000 | Roadway Widening/Relocation/New Facility |
Kentaboo Avenue Sidewalk View Project Sheet | Kentaboo Avenue | Curtis Avenue to Virginia Avenue | Construct 3,720 feet of sidewalk along the south side of the roadway to connect homes and churches to Florence Park. | $1,070,000 | Bike/Ped |
KY 1017 (Turfway Road) to I-275 Interchange View Project Sheet Modifications | I-71/75 | KY 1017 (Turfway Road) to I-275 | Complete an Interchange Modification Study to determine improvements to upgrade the I-71/75 interchanges with I-275, KY 236 (Donaldson Highway), and KY 1017 (Turfway Road) to improve safety and capacity and mobility to northern Boone and Kenton Counties. Construct improvements as recommended. | $90,000,000 | Roadway Widening/Relocation/New Facility |
KY 14 (Mary Grubbs Highway) Interchange Modification Phase 1 View Project Sheet | I-75 | KY 14 (Mary Grubbs Highway) Southbound Ramps | Conduct an Interchange Modification Study to identify a short-term safety and congestion improvement for the southbound exit ramp and intersection with KY 14. Dedicated dual left turn lanes and a dedicated right turn lane should be considered to improve congestion. Construct the improvements as recommended. | $2,130,000 | Roadway Maintenance/Reconstruction |
KY 20 (Petersburg Road) Widening View Project Sheet | KY 20 (Petersburg Road) | Graves Road to KY 237 (North Bend Road) | Widen KY 20 (Petersburg Road) from two to four lanes with multi-use path to improve mobility and reduce congestion in northern Boone County. | $23,800,000 | Roadway Widening/Relocation/New Facility |
KY 20/Aviation Boulevard Intersection Improvement View Project Sheet | KY 20 (Petersburg Road) | Aviation Boulevard | Install a left turn lane on eastbound and westbound KY 20 (Petersburg Road) at Aviation Boulevard. Consider installation of a new traffic signal. | $820,000 | Traffic Operations |
KY 236 (Donaldson Highway) Widening View Project Sheet | KY 236 (Donaldson Highway) | KY 3076 (Mineola Pike) to KY 842 (Houston Road) | Widen KY 236 (Donaldson Highway) from two to four lanes to improve capacity and support economic development. Include a multi-use path as part of the CVG Loop Trail. | $20,520,000 | Roadway Widening/Relocation/New Facility |
KY 237 (Gunpowder Road) Widening View Project Sheet | KY 237 (Gunpowder Road) | KY 536 (Mount Zion Road) to US 42 | Widen KY 237 (Gunpowder Road) from two to four lanes with multi-use path to improve safety and mobility through central Boone County. | $11,080,000 | Roadway Widening/Relocation/New Facility |
KY 237 (North Bend Road) Widening View Project Sheet | KY 237 (North Bend Road) | KY 2846 (Tanner Road)/Global Way to Graves Road | Widen KY 237 (North Bend Road) from two to four lanes and widen the two roundabouts at Graves Road and Cardinal Way from one to two lanes to reduce congestion. | $12,900,000 | Roadway Widening/Relocation/New Facility |
KY 237/Conrad Lane Intersection Improvements View Project Sheet | KY 237 (North Bend Road) | Conrad Lane | Install full right turn lanes on the KY 237 (North Bend Road) northbound and southbound approaches to Conrad Lane to improve capacity and safety. | $700,000 | Traffic Operations |
KY 3076 (Mineola Pike) Extension Phase 1 View Project Sheet | New Facility | South Airfield Drive to KY 236 (Donaldson Highway) | Extend KY 3076 (Mineola Pike) approximately 0.5 miles to provide a new, four lane direct connection from the Cincinnati/Northern Kentucky International Airport to I-275. Construct a multi-use path as part of the CVG Loop Trail. | $4,880,000 | Roadway Widening/Relocation/New Facility |
KY 3076 (Mineola Pike) Extension Phase 2 View Project Sheet | New Facility | South Airfield Drive to KY 1017 (Aero Parkway) | Extend KY 3076 (Mineola Pike) south approximately 1.15 miles to KY 1017 (Aero Parkway) along a new four lane facility. Reconstruct a portion of KY 717 (Turfway Road) to intersect with the new roadway. Construct a multi-use path as part of the CVG Loop Trail. | $9,440,000 | Roadway Widening/Relocation/New Facility |
KY 3076 (Mineola Pike) Interchange Modification View Project Sheet | I-275 | KY 3076 (Mineola Pike) | Perform an Interchange Modification Study to reconstruct the interchange at KY 3076 (Mineola Pike) to improve mobility and support economic development. Include a dedicated bicycle and pedestrian facility across the interchange. Construct the improvements as recommended. | $44,000,000 | Roadway Widening/Relocation/New Facility |
KY 3076 (Mineola Pike) Widening View Project Sheet | KY 3076 (Mineola Pike) | KY 236 (Donaldson Highway) to the I-275 Eastbound Ramps | Widen KY 3076 (Mineola Pike) from two to four travel lanes to support freight and improve mobility between the Cincinnati/Northern Kentucky International Airport and I-275 and construct a multi-use path. | $16,000,000 | Roadway Widening/Relocation/New Facility |
KY 338 (Richwood Road) Interchange Modification View Project Sheet | I-71/75 | KY 338 (Richwood Road) | Reconstruct the I-71/75 interchange at KY 338 (Richwood Road) and widen KY 338 from two to four lanes. This project also includes the widening of US 25 (Dixie Highway) from two to four lanes between KY 338 to Winning Colors Drive with grade separation of KY 338 at US 25 and railroad overpass for KY 338. (Kentucky Transportation Cabinet Item Number 06-18.00 and 06-351.10). | $96,950,000 | Roadway Widening/Relocation/New Facility |
KY 338 (Richwood Road) Widening View Project Sheet | KY 338 (Richwood Road) | Hicks Pike to Triple Crown Boulevard | Widen KY 338 (Richwood Road) from two to four lanes with multi-use paths on both sides of the roadway. | $5,330,000 | Roadway Widening/Relocation/New Facility |
KY 536 (Mount Zion Road) Interchange Modification View Project Sheet | I-71/75 | KY 536 (Mount Zion Road) | Reconstruct the I-71/75 interchange at KY 536 (Mount Zion Road). (Kentucky Transportation Cabinet Item Number 06-14.00). | $27,510,000 | Roadway Widening/Relocation/New Facility |
KY 842 Richardson Road Bridge Replacement View Project Sheet | KY 842 (Richardson Road) | Norfolk Southern Railroad | Replace bridge over Norfolk Southern Rail Road on KY 842 (Richardson Road). (Kentucky Transportation Cabinet Item Number 06-1087.00). | $6,000,000 | Bridge Replacement/Repair |
Litton Lane/KY 237 Intersection Improvement View Project Sheet | Litton Lane | KY 237 (North Bend Road) | Install video actuation to detect the end of the queue on the eastbound Litton Lane approach to the intersection with KY 237 (North Bend Road) to increase capacity. Adjust signal timing as needed. | $20,000 | Traffic Operations |
Longbranch Road Bridge Replacement View Project Sheet | Longbranch Road | Fowlers Creek | Replace the Longbranch Road bridge over Fowlers Creek. | $2,050,000 | Bridge Replacement/Repair |
Mall Road Connector Phase 1 View Project Sheet | New Facility | Mall Road to KY 842 (Hopeful Church Road) | Perform a study to determine the preferred alignment of a new, 1.4 mile, two lane roadway with multi-use path between Mall Road to KY 237 (Pleasant Valley Road) to provide an alternative route to congested arterials in the western Florence and Oakbrook areas. Implement the first phase identified in this study from Mall Road to KY 842. | $9,440,000 | Roadway Widening/Relocation/New Facility |
Old Union Road Sidewalk (Boone County) View Project Sheet | Old Union Road | Old Union Road to US 42 | Install approximately 250 feet of pedestrian facilities on Old Union Road to connect the multi-use path along Orleans Boulevard to the sidewalk on Old Union Road, near the intersection with US 42. | $200,000 | Bike/Ped |
Pedestrian Facility Program View Project Sheet | Various Facilities | Boone County | Continue Boone County's pedestrian facility program to install sidewalks , multi-use paths, crosswalks, lighting, and other public infrastructure to facilitate safe walking and bicycling as needed throughout the County. | $300,000 | Bike/Ped |
TANK CVG Transit Station View Project Sheet | TBD | Cincinnati/Northern Kentucky International Airport | In conjunction with the CVG Master Plan Update, construct a new transit station at the Cincinnati/Northern Kentucky International Airport to service multiple, future TANK transit route expansions connecting this vital transportation node with the region. Hub features include a sheltered waiting/transfer area and bus bay with storage capacity for up to three, 40 foot buses. | $2,050,000 | Transit |
TANK Pilot Service Program View Project Sheet | Various Facilities | Hebron, CVG, Mt Zion/Richwood Road employment centers | Provide operating funds for TANK pilot service that leverage private contributions and connect industrial parks and major employers with high volume TANK fixed route and Park & Ride lots. | $250,000 | Transit |
Toebben Drive/KY 536 Intersection Improvement View Project Sheet | Toebben Drive | KY 536 (Mount Zion Road) | Install a right turn lane on the northbound Toebben Drive approach to the intersection with KY 536 to improve capacity at the intersection and support freight. | $450,000 | Traffic Operations |
Two System Transit Transfer Policy View Project Sheet | N/A | Ohio, Kentucky, Indiana Region | Encourage TANK and Metro to consider updating existing policies to lessen financial and physical barriers associated with using both transit systems to access jobs. | Policy | |
US 42 Adaptive Signal Control Improvements View Project Sheet | US 42 | KY 237 (Pleasant Valley Road) to Ewing Boulevard | Perform a signal timing and coordination study to examine the existing signal system and potential benefit of introducing adaptive signal controls. Install improvements as recommended. | $820,000 | Traffic Operations |
US 42 Interchange Modification View Project Sheet | I-71/75 | US 42 | Complete an Interchange Modification Study and reconstruct the interchange as recommended. Include a dedicated bicycle and pedestrian facility across the interchange. | $58,500,000 | Roadway Widening/Relocation/New Facility |
Youell Road Connector View Project Sheet | New Facility | KY 1017 (Aero Parkway) to KY 237 (North Bend Road) | Construct a new, four lane roadway to connect KY 1017 (Aero Parkway) and KY 237 (North Bend Road) in the area southwest of the Cincinnati/Northern Kentucky International Airport to assist in accommodating future, planned industrial development on KY 1017. Include a multi-use path as part of the CVG Loop Trail. | $27,600,000 | Roadway Widening/Relocation/New Facility |
Tier 2 Recommendations
Project Title Facility Location Description Cost Estimate (2017 $) Project Type
Bullittsville Road Phase 1
View Project Sheet
Bullittsville Road 0.5 miles north of Conrad Lane to KY 20 (Petersburg Road) Widen Bullittsville Road from two to four lanes with multi-use path to improve mobility in northern Boone County. $29,400,000 Roadway Widening/Relocation/New Facility
Bullittsville Road Phase 2
View Project Sheet
New Facility Bullittsville Road to Gateway Boulevard Extend Gateway Boulevard to Bullittsville Road along a new, two lane facility with multi-use path to improve east-west mobility. $3,510,000 Roadway Widening/Relocation/New Facility
Central Parkway Scoping Study
View Project Sheet
New Route Central Boone County Perform a scoping study to determine the preferred alignment, cost estimates, and potential phases of a Central Parkway to improve mobility through Boone County. The route should connect Camp Ernst Road at KY 237 (Pleasant Valley) to Verona. $500,000 Study
Hicks Pike Reconstruction Phase 2
View Project Sheet
Hicks Pike US 42 to Man O War Boulevard Reconstruct Hicks Pike and provide provide a multi-use path. $8,080,000 Roadway Maintenance/Reconstruction
Holbrook Lane
View Project Sheet
New Facility Rogers Lane to Tiger Court Construct a new, two lane roadway with multi-use path to improve mobility between Rogers Lane, KY 237 (Camp Ernst Road), and Oakbrook Drive. $2,240,000 Roadway Widening/Relocation/New Facility
KY 14 (Mary Grubbs Highway) Interchange Modification Phase 2
View Project Sheet
I-75 KY 14 (Mary Grubbs Highway) Conduct an Interchange Modification Study to identify a long-term safety and congestion improvement for the KY 14 intersections at the I-71/75 southbound exit ramp and KY 1292 (Beaver Road). $25,000,000 Roadway Maintenance/Reconstruction
KY 18 (Burlington Pike) Interchange Modification
View Project Sheet
I-71/75 KY 18 (Burlington Pike) Complete an Interchange Modification Study and reconstruct the interchange as recommended to add capacity and improve congestion. Include bicycle and pedestrian accommodations on both sides of the roadway. $31,420,000 Roadway Maintenance/Reconstruction
KY 18 (Burlington Pike) Widening
View Project Sheet
KY 18 (Burlington Pike) Springfield Boulevard to KY 338 (Jefferson Street) Widen KY 18 (Burlington Pike) from two to four lanes with multi-use path to improve safety for bicycle, pedestrian, and vehicular traffic. $30,630,000 Roadway Widening/Relocation/New Facility
KY 18/Aero Parkway Intersection Improvement
View Project Sheet
KY 18 (Burlington Pike) KY 1017 (Aero Parkway) Improve capacity at the KY 18 (Burlington Pike) intersection with KY 1017 (Aero Parkway) to support existing and future traffic volumes. Consider grade separation design options, as well as non-conventional at grade intersection treatments. $47,150,000 Roadway Widening/Relocation/New Facility
KY 20 (Petersburg Road) Curve Reconstruction
View Project Sheet
KY 20 (Petersburg Road) Approximate MP 6.8 to 7.1 Reconstruct the curve to reduce the number and severity of crashes. $3,400,000 Roadway Maintenance/Reconstruction
KY 338 (Beaver Road) Bridge Replacement
View Project Sheet
KY 338 (Beaver Road) Gum Branch Replace the KY 338 bridge over Gum Branch. $1,920,000 Bridge Replacement/Repair
KY 3503/Empire Drive Sidewalk
View Project Sheet
KY 3503 and KY 2847 (Empire Drive) KY 842 (Industrial Road) to US 25 (Dixie Highway) Construct a sidewalk along the east side of the roadway. $1,220,000 Bike/Ped
KY 536 (Rabbit Hash Road) Safety Improvements
View Project Sheet
KY 536 (Rabbit Hash Road) KY 2856 (Riddles Run Road) to KY 338 (East Bend Road) Perform a safety audit. Install low cost safety improvements such as curve sign upgrades and high friction surface on KY 536 (Rabbit Hash Road) in sharp curves between KY 2852 and KY 338 as recommended in the safety audit. $90,000 Roadway Maintenance/Reconstruction
KY 842 (Richardson Road) Widening and US 25 Intersection Improvements
View Project Sheet
KY 842 (Richardson Road) US 25 (Dixie Highway) to Boone County Line Improve safety and operations at the intersection of KY 842 (Richardson Road) and US 25 (Dixie Highway) and widen KY 842 from west of US 25 to the Boone County Line. Include multi-use paths along both sides of the roadway. $6,030,000 Roadway Maintenance/Reconstruction
Litton Lane Extension
View Project Sheet
New Facility Existing Litton Lane to Graves Road Provide a two lane extension of existing Litton Lane to Graves Road that includes a multi-use path. $5,380,000 Roadway Widening/Relocation/New Facility
Mall Road Connector Phase 2
View Project Sheet
New Facility KY 842 (Hopeful Church Road) to KY 237 (Pleasant Valley Road) Provide a new, two lane roadway with multi-use path to improve east-west mobility with an alternative route to congested arterials. $8,830,000 Roadway Widening/Relocation/New Facility
New Buffington Multi-Use Path
View Project Sheet
New Buffington Road US 25 (Dixie Highway) to Kenton County Line Construct an approximate 2,500-foot long, 10-foot wide multi-use path on one side of New Buffington Road. $1,150,000 Bike/Ped
Toebben Drive Extensions
View Project Sheet
Toebben Drive and Fleet Lane Toebben Drive to KY 536 (Mount Zion Road) Construct a two lane extension of Toebben Drive east and northward to connect with KY 536 in Kenton County to address capacity and support economic development. Extend Fleet Lane to connect with the new Toebben Extension. Install multi-use path on all existing and new Toebben Drive and Fleet Lane facilities. $6,930,000 Roadway Widening/Relocation/New Facility
US 25/Empire Drive Intersection Improvement
View Project Sheet
US 25 (Dixie Highway) KY 2847 (Empire Drive) Complete a traffic study and signal warrant analysis to reduce delay and improve safety at the intersection. Install improvements as recommended. $930,000 Traffic Operations
Project Title | Facility | Location | Description | Cost Estimate (2017 $) | Project Type |
---|---|---|---|---|---|
Bullittsville Road Phase 1 View Project Sheet | Bullittsville Road | 0.5 miles north of Conrad Lane to KY 20 (Petersburg Road) | Widen Bullittsville Road from two to four lanes with multi-use path to improve mobility in northern Boone County. | $29,400,000 | Roadway Widening/Relocation/New Facility |
Bullittsville Road Phase 2 View Project Sheet | New Facility | Bullittsville Road to Gateway Boulevard | Extend Gateway Boulevard to Bullittsville Road along a new, two lane facility with multi-use path to improve east-west mobility. | $3,510,000 | Roadway Widening/Relocation/New Facility |
Central Parkway Scoping Study View Project Sheet | New Route | Central Boone County | Perform a scoping study to determine the preferred alignment, cost estimates, and potential phases of a Central Parkway to improve mobility through Boone County. The route should connect Camp Ernst Road at KY 237 (Pleasant Valley) to Verona. | $500,000 | Study |
Hicks Pike Reconstruction Phase 2 View Project Sheet | Hicks Pike | US 42 to Man O War Boulevard | Reconstruct Hicks Pike and provide provide a multi-use path. | $8,080,000 | Roadway Maintenance/Reconstruction |
Holbrook Lane View Project Sheet | New Facility | Rogers Lane to Tiger Court | Construct a new, two lane roadway with multi-use path to improve mobility between Rogers Lane, KY 237 (Camp Ernst Road), and Oakbrook Drive. | $2,240,000 | Roadway Widening/Relocation/New Facility |
KY 14 (Mary Grubbs Highway) Interchange Modification Phase 2 View Project Sheet | I-75 | KY 14 (Mary Grubbs Highway) | Conduct an Interchange Modification Study to identify a long-term safety and congestion improvement for the KY 14 intersections at the I-71/75 southbound exit ramp and KY 1292 (Beaver Road). | $25,000,000 | Roadway Maintenance/Reconstruction |
KY 18 (Burlington Pike) Interchange Modification View Project Sheet | I-71/75 | KY 18 (Burlington Pike) | Complete an Interchange Modification Study and reconstruct the interchange as recommended to add capacity and improve congestion. Include bicycle and pedestrian accommodations on both sides of the roadway. | $31,420,000 | Roadway Maintenance/Reconstruction |
KY 18 (Burlington Pike) Widening View Project Sheet | KY 18 (Burlington Pike) | Springfield Boulevard to KY 338 (Jefferson Street) | Widen KY 18 (Burlington Pike) from two to four lanes with multi-use path to improve safety for bicycle, pedestrian, and vehicular traffic. | $30,630,000 | Roadway Widening/Relocation/New Facility |
KY 18/Aero Parkway Intersection Improvement View Project Sheet | KY 18 (Burlington Pike) | KY 1017 (Aero Parkway) | Improve capacity at the KY 18 (Burlington Pike) intersection with KY 1017 (Aero Parkway) to support existing and future traffic volumes. Consider grade separation design options, as well as non-conventional at grade intersection treatments. | $47,150,000 | Roadway Widening/Relocation/New Facility |
KY 20 (Petersburg Road) Curve Reconstruction View Project Sheet | KY 20 (Petersburg Road) | Approximate MP 6.8 to 7.1 | Reconstruct the curve to reduce the number and severity of crashes. | $3,400,000 | Roadway Maintenance/Reconstruction |
KY 338 (Beaver Road) Bridge Replacement View Project Sheet | KY 338 (Beaver Road) | Gum Branch | Replace the KY 338 bridge over Gum Branch. | $1,920,000 | Bridge Replacement/Repair |
KY 3503/Empire Drive Sidewalk View Project Sheet | KY 3503 and KY 2847 (Empire Drive) | KY 842 (Industrial Road) to US 25 (Dixie Highway) | Construct a sidewalk along the east side of the roadway. | $1,220,000 | Bike/Ped |
KY 536 (Rabbit Hash Road) Safety Improvements View Project Sheet | KY 536 (Rabbit Hash Road) | KY 2856 (Riddles Run Road) to KY 338 (East Bend Road) | Perform a safety audit. Install low cost safety improvements such as curve sign upgrades and high friction surface on KY 536 (Rabbit Hash Road) in sharp curves between KY 2852 and KY 338 as recommended in the safety audit. | $90,000 | Roadway Maintenance/Reconstruction |
KY 842 (Richardson Road) Widening and US 25 Intersection Improvements View Project Sheet | KY 842 (Richardson Road) | US 25 (Dixie Highway) to Boone County Line | Improve safety and operations at the intersection of KY 842 (Richardson Road) and US 25 (Dixie Highway) and widen KY 842 from west of US 25 to the Boone County Line. Include multi-use paths along both sides of the roadway. | $6,030,000 | Roadway Maintenance/Reconstruction |
Litton Lane Extension View Project Sheet | New Facility | Existing Litton Lane to Graves Road | Provide a two lane extension of existing Litton Lane to Graves Road that includes a multi-use path. | $5,380,000 | Roadway Widening/Relocation/New Facility |
Mall Road Connector Phase 2 View Project Sheet | New Facility | KY 842 (Hopeful Church Road) to KY 237 (Pleasant Valley Road) | Provide a new, two lane roadway with multi-use path to improve east-west mobility with an alternative route to congested arterials. | $8,830,000 | Roadway Widening/Relocation/New Facility |
New Buffington Multi-Use Path View Project Sheet | New Buffington Road | US 25 (Dixie Highway) to Kenton County Line | Construct an approximate 2,500-foot long, 10-foot wide multi-use path on one side of New Buffington Road. | $1,150,000 | Bike/Ped |
Toebben Drive Extensions View Project Sheet | Toebben Drive and Fleet Lane | Toebben Drive to KY 536 (Mount Zion Road) | Construct a two lane extension of Toebben Drive east and northward to connect with KY 536 in Kenton County to address capacity and support economic development. Extend Fleet Lane to connect with the new Toebben Extension. Install multi-use path on all existing and new Toebben Drive and Fleet Lane facilities. | $6,930,000 | Roadway Widening/Relocation/New Facility |
US 25/Empire Drive Intersection Improvement View Project Sheet | US 25 (Dixie Highway) | KY 2847 (Empire Drive) | Complete a traffic study and signal warrant analysis to reduce delay and improve safety at the intersection. Install improvements as recommended. | $930,000 | Traffic Operations |
Unscheduled Need Recommendations
Project Title Facility Location Description Cost Estimate (2017 $) Project Type
Bullittsville Road Phase 3 Bullittsville Road Conrad Lane to a point 0.5 miles north Widen Bullittsville Road from two to four lanes with multi-use path to improve mobility in northern Boone County. $9,500,000 Roadway Widening/Relocation/New Facility
Camp Ernst Road Widening Phase 2 Camp Ernst Road KY 536 (Hathaway Road) to the Boone County Arboretum Widen Camp Ernst Road from two to four lanes with multi-use path to improve safety and mobility. $16,000,000 Roadway Widening/Relocation/New Facility
Coral Drive Extension New Facility Coral Drive to KY 20 (Petersburg Road) tunnel under the Cincinnati/Northern Kentucky International Airport. Construct a new, two lane roadway for approximately 1.25 miles to connect KY 20 (Petersburg Road) to KY 237 (North Bend Road) at Coral Drive to improve mobility between the Hebron area and the Cincinnati/Northern Kentucky International Airport. $6,500,000 Roadway Widening/Relocation/New Facility
CVG Loop Trail Various Facilities Various locations north of the Cincinnati/Northern Kentucky International Airport Complete remaining segments of the CVG Loop Trail along the northern parameter of the Cincinnati/Northern Kentucky International Airport that are not included in planned roadway projects such as the Mineola Pike Extension Phases 1 and 2, Youell Connector, KY 237 Multi-Use Path, and the Conner Road Multi-Use Path. This project will complete the CVG Loop Trail to encourage safe walking and bicycling. $5,700,000 Bike/Ped
KY 14 (Verona Mudlick Road) Reconstruction KY 14 (Verona Mudlick Road) I-71 to US 42 Reconstruct KY 14 (Verona Mudlick Road) to address existing geometric deficiencies and improve safety and mobility. $33,070,000 Roadway Maintenance/Reconstruction
KY 20 (Petersburg Road) Improvement KY 20 (Petersburg Road) KY 237 (North Bend Road) to Conner Road Reconstruct KY 20 (Petersburg Road) from Conner Road to KY 237 to improve mobility between Hebron and the Cincinnati/Northern Kentucky International Airport. $14,200,000 Roadway Maintenance/Reconstruction
KY 20 (Petersburg Road) Interchange I-275 KY 20 (Petersburg Road) Perform an Interchange Justification Study for a new interchange on I-275 at KY 20 (Petersburg Road) near milepoint 5 to support economic development. Construct the interchange as recommended. $500,00,000 Roadway Widening/Relocation/New Facility
KY 212 Interchange Modification I-275 KY 212 (Terminal Drive) Reconstruct the I-275 interchange at KY 212 and reconstruct KY 20 (Petersburg Road) near the Cincinnati/Northern Kentucky International Airport. (Kentucky Transportation Cabinet Item Number 06-8000.20) $50,000,000 Roadway Maintenance/Reconstruction
KY 3060 (Frogtown Road) Reconstruction KY 3060 (Frogtown Road) KY 3060 (Frogtown Road) from US 42 to US 25 (Dixie Highway) Reconstruct KY 3060 (Frogtown Road) and construct a multi-use path to improve safety and support economic development. $16,000,000 Roadway Maintenance/Reconstruction
KY 3608 (Idlewild Bypass) Interchange Modification I-275 KY 3608 (Idlewild Bypass) Perform an Interchange Modification Study to improve the ramps at the I-275 exit (11) in Petersburg to support economic development. $1,000,000 Study
Longbranch Road Reconstruction Longbranch Road Cooper High School to Orleans Boulevard Reconstruct Longbranch Road and install a multi-use path along the south side of the roadway to improve mobility and facilitate alternative modes of transportation. $7,000,000 Roadway Maintenance/Reconstruction
Old Union Road Sidewalk (Union) Old Union Road US 42 to Orleans Boulevard Install pedestrian facilities along Old Union road to connect residential development to the Union Pool and the future Union Towne Center. $999,000 Bike/Ped
Rice Pike Reconstruction Rice Pike Crayton Way to US 42 Reconstruct Rice Pike and install pedestrian facilities to accommodate future development. $15,000,000 Roadway Maintenance/Reconstruction
Rogers Lane Reconstruction Rogers Lane Hanover Boulevard to Torrid Street Reconstruct Rogers Lane, provide left turn lanes at intersections with existing residential streets and install sidewalks to improve safety and support alternative modes of transportation. $14,000,000 Roadway Maintenance/Reconstruction
US 25 Widening US 25 (Dixie Highway) Winning Colors Drive to the bridge over the Norfolk Railroad Crossing Widen US 25 from two to four lanes with multi-use path to improve mobility and reduce congestion. Project does not include the railroad grade separation at KY 536. $47,800,000 Roadway Widening/Relocation/New Facility
US 25 Widening US 25 (Dixie Highway) Logistics Boulevard to KY 338 (Richwood Road) Widen US 25 from two to four lanes with multi-use path to reduce congestion and support economic development. $13,000,000 Roadway Widening/Relocation/New Facility
US 25 Widening and KY 536 Intersection Improvement US 25 (Dixie Highway) Beeson Drive to Aristocrat Drive Widen US 25 from two to four lanes with multi-use path and improve US 25 at the KY 536 intersection to improve safety and capacity. $31,250,000 Roadway Widening/Relocation/New Facility
US 42 Curve Reconstruction US 42 Baker Road to Miller-Owens Road Reconstruct the curve to reduce the number and severity of crashes. $1,600,000 Roadway Maintenance/Reconstruction
US 42 Widening US 42 Hicks Pike to Raiders Run Widen US 42 from two to four lanes with multi-use path between Ryle High School and Hicks Pike. $16,500,000 Roadway Widening/Relocation/New Facility
Project Title | Facility | Location | Description | Cost Estimate (2017 $) | Project Type |
---|---|---|---|---|---|
Bullittsville Road Phase 3 | Bullittsville Road | Conrad Lane to a point 0.5 miles north | Widen Bullittsville Road from two to four lanes with multi-use path to improve mobility in northern Boone County. | $9,500,000 | Roadway Widening/Relocation/New Facility |
Camp Ernst Road Widening Phase 2 | Camp Ernst Road | KY 536 (Hathaway Road) to the Boone County Arboretum | Widen Camp Ernst Road from two to four lanes with multi-use path to improve safety and mobility. | $16,000,000 | Roadway Widening/Relocation/New Facility |
Coral Drive Extension | New Facility | Coral Drive to KY 20 (Petersburg Road) tunnel under the Cincinnati/Northern Kentucky International Airport. | Construct a new, two lane roadway for approximately 1.25 miles to connect KY 20 (Petersburg Road) to KY 237 (North Bend Road) at Coral Drive to improve mobility between the Hebron area and the Cincinnati/Northern Kentucky International Airport. | $6,500,000 | Roadway Widening/Relocation/New Facility |
CVG Loop Trail | Various Facilities | Various locations north of the Cincinnati/Northern Kentucky International Airport | Complete remaining segments of the CVG Loop Trail along the northern parameter of the Cincinnati/Northern Kentucky International Airport that are not included in planned roadway projects such as the Mineola Pike Extension Phases 1 and 2, Youell Connector, KY 237 Multi-Use Path, and the Conner Road Multi-Use Path. This project will complete the CVG Loop Trail to encourage safe walking and bicycling. | $5,700,000 | Bike/Ped |
KY 14 (Verona Mudlick Road) Reconstruction | KY 14 (Verona Mudlick Road) | I-71 to US 42 | Reconstruct KY 14 (Verona Mudlick Road) to address existing geometric deficiencies and improve safety and mobility. | $33,070,000 | Roadway Maintenance/Reconstruction |
KY 20 (Petersburg Road) Improvement | KY 20 (Petersburg Road) | KY 237 (North Bend Road) to Conner Road | Reconstruct KY 20 (Petersburg Road) from Conner Road to KY 237 to improve mobility between Hebron and the Cincinnati/Northern Kentucky International Airport. | $14,200,000 | Roadway Maintenance/Reconstruction |
KY 20 (Petersburg Road) Interchange | I-275 | KY 20 (Petersburg Road) | Perform an Interchange Justification Study for a new interchange on I-275 at KY 20 (Petersburg Road) near milepoint 5 to support economic development. Construct the interchange as recommended. | $500,00,000 | Roadway Widening/Relocation/New Facility |
KY 212 Interchange Modification | I-275 | KY 212 (Terminal Drive) | Reconstruct the I-275 interchange at KY 212 and reconstruct KY 20 (Petersburg Road) near the Cincinnati/Northern Kentucky International Airport. (Kentucky Transportation Cabinet Item Number 06-8000.20) | $50,000,000 | Roadway Maintenance/Reconstruction |
KY 3060 (Frogtown Road) Reconstruction | KY 3060 (Frogtown Road) | KY 3060 (Frogtown Road) from US 42 to US 25 (Dixie Highway) | Reconstruct KY 3060 (Frogtown Road) and construct a multi-use path to improve safety and support economic development. | $16,000,000 | Roadway Maintenance/Reconstruction |
KY 3608 (Idlewild Bypass) Interchange Modification | I-275 | KY 3608 (Idlewild Bypass) | Perform an Interchange Modification Study to improve the ramps at the I-275 exit (11) in Petersburg to support economic development. | $1,000,000 | Study |
Longbranch Road Reconstruction | Longbranch Road | Cooper High School to Orleans Boulevard | Reconstruct Longbranch Road and install a multi-use path along the south side of the roadway to improve mobility and facilitate alternative modes of transportation. | $7,000,000 | Roadway Maintenance/Reconstruction |
Old Union Road Sidewalk (Union) | Old Union Road | US 42 to Orleans Boulevard | Install pedestrian facilities along Old Union road to connect residential development to the Union Pool and the future Union Towne Center. | $999,000 | Bike/Ped |
Rice Pike Reconstruction | Rice Pike | Crayton Way to US 42 | Reconstruct Rice Pike and install pedestrian facilities to accommodate future development. | $15,000,000 | Roadway Maintenance/Reconstruction |
Rogers Lane Reconstruction | Rogers Lane | Hanover Boulevard to Torrid Street | Reconstruct Rogers Lane, provide left turn lanes at intersections with existing residential streets and install sidewalks to improve safety and support alternative modes of transportation. | $14,000,000 | Roadway Maintenance/Reconstruction |
US 25 Widening | US 25 (Dixie Highway) | Winning Colors Drive to the bridge over the Norfolk Railroad Crossing | Widen US 25 from two to four lanes with multi-use path to improve mobility and reduce congestion. Project does not include the railroad grade separation at KY 536. | $47,800,000 | Roadway Widening/Relocation/New Facility |
US 25 Widening | US 25 (Dixie Highway) | Logistics Boulevard to KY 338 (Richwood Road) | Widen US 25 from two to four lanes with multi-use path to reduce congestion and support economic development. | $13,000,000 | Roadway Widening/Relocation/New Facility |
US 25 Widening and KY 536 Intersection Improvement | US 25 (Dixie Highway) | Beeson Drive to Aristocrat Drive | Widen US 25 from two to four lanes with multi-use path and improve US 25 at the KY 536 intersection to improve safety and capacity. | $31,250,000 | Roadway Widening/Relocation/New Facility |
US 42 Curve Reconstruction | US 42 | Baker Road to Miller-Owens Road | Reconstruct the curve to reduce the number and severity of crashes. | $1,600,000 | Roadway Maintenance/Reconstruction |
US 42 Widening | US 42 | Hicks Pike to Raiders Run | Widen US 42 from two to four lanes with multi-use path between Ryle High School and Hicks Pike. | $16,500,000 | Roadway Widening/Relocation/New Facility |